"To improve the roads in Wisconsin by delivering thoughtful and timely research findings for implementation."
|
Implementation Project for Developing Rational Overlay Design Procedures for Flexible Pavements |
| Quarterly Reports |
Additional Documents/Data |
Final Report |
2007-Q1
2007-Q2
2007-Q3
2007-Q4
2008-Q1
2008-Q2
|
|
Executive Summary
Powerpoint Presentation |
| Project ID: |
0092-07-12 |
| Title: |
Implementation Project for Developing Rational Overlay Design Procedures for Flexible Pavements |
| PI: |
James A. Crovetti
Center for Highway and Traffic Engineering
Marquette University |
| Project: |
This project will develop revised procedures for the structural design of HMA overlays on existing HMA pavements. The developed procedures will be demonstrated in workshops to be conducted throughout the State. This project will also develop revisions, as necessary, to the WisDOT Facilities Development Manual (FDM). |
| Start Date: |
April 24, 2007 |
| End Date: |
December 31, 2007 |
| Extension: |
June 30, 2008 |
| Project Award: |
$15,000 |
| TOC: |
Flexible Pavements |
|