"To improve the roads in Wisconsin by delivering thoughtful and timely research findings for implementation."
|
Structures
Rapid Bridge Construction
Technology: Precast Elements for Substructures |
| Quarterly Reports |
Additional Documents/Data |
Final Report |
2006-Q4
2007-Q1
2007-Q2
2007-Q3
2007-Q4
2008-Q1
2008-Q2
2008-Q3
|
Literature
Search
Request for Proposal |
|
| Project ID: |
0092-07-08 |
| Title: |
Rapid Bridge Construction Technology:
Precast Elements for Substructures |
| PI: |
Michael Oliva
Department of Civil and Environmental Engineering
University of Wisconsin-Milwaukee |
| Project: |
The objectives of this research are
all aimed at increasing the speed of substructure construction while
improving durabiliy. Specifically, these objectives are:M
1. To identify possible precast substructure systems and select
systems that appear most appropriate for use in Wisconsin
2. To develop standard plans for selected components and connections.
3.To prepare design examples, showing how a system is selected and
how components and connections can be sized.
4.Prepare cost estimates for varius alternate standard subsystems.
5.Suggest alternate substructure specifications and contracting
methods that will encourage the use of rapid construction techniques
by contractors.
|
| Start Date: |
October 1, 2006 |
| End Date: |
October 1, 2008 |
| Project Award: |
$124,411 |
| TOC: |
Structures |
|