| Project ID: |
DOT 0092-07-09 |
| Title: |
Monitoring and Load Distribution Study
for the Land Bridge |
| PI: |
Al Ghorbanpoor
Department of Civil Engineering and Mechanics
University of Wisconsin-Milwaukee |
| Project: |
The objectives of this work are to extend
the monitoring period of the Land bridge for an additional two years
and to document the response of the bridge over a longer period than
was possible in the original study, and to study the truck wheel load
distribution on the deck and the tub girders through tests performed
at the bridge using WISDOT trucks with known axle loads as well as
performing numerical analysis. |
| Start Date: |
October 1, 2006 |
| End Date: |
October 1, 2008 |
| Extension: |
January 1, 2009, July 1, 2010 |
| Project Award: |
$30,000 |