Project 0092-00-06: Determining a Temperature-Density Relationship after Completed Rolling of HMA (Completed)
| Quarterly Reports | Additional Documents/Data | Final Report/Briefs |
|---|---|---|
|
Implementation
and Closure Form Research Brief |
Final Report 06/2002 | |
| Project ID: | 0092-00-06 (WHRP 02-01) | |
| Title: | Determining a Temperature-Density Relationship after Completed Rolling of HMA | |
| PI: | Awad S. Hanna Department of Civil and Environmental Engineering University of Wisconsin-Madison |
|
| Project: | This study measured asphalt pavement densities on several construction projects after final rolling and then in the same location the following day when the pavement had cooled. Results indicated no significant difference between the two density measurements. Parallel tests were conducted with laboratory samples of compacted asphalt. | |
| Start Date: | February 2000 | |
| End Date: | June 2002 | |
| Project Award: | $50,000 | |
| TOC: | Flexible Pavements | |