Current Research
Completed Research
Research Implementation Activities
Completed Research
Research Implementation Activities
Current Research
| Project ID | Title | Expected End Date | 0092-04-10 | Monitoring and Evaluation of Fly Ash Stabilized Subgrade Constructed by Wisconsin DOT | June 30, 2009 |
|---|---|---|
| 0092-06-04 | Construction Vibration Attenuation with Distance and its Effect on the Quality of Early-Age Concrete | June 30, 2010 |
| 0092-07-06 | Development of Full Scale Testing of and Alternate Foundation System for Post and Panel Retaining Walls | December 31, 2009 |
| 0092-08-07 | Evaluation of Intelligent Compaction Technology for Densification of Roadway Subgrades and Structural Layers | June 30, 2010 |
| 0092-08-11 | Effective Depth of Soil Compaction in Relation to Applied Compactive Energy | December 31, 2009 |
| 0092-08-12 | Determination of Resilient Modulus Values for Typical Plastic Soils in Wisconsin | March 31, 2010 |
| 0092-09-04 | Evaluation of Constructed, Cast-in-Place (CIP) Piling Properties |
May 1, 2011 |
| 0092-09-05 | Evaluation of the Foundation Movements of Transportation Structures | February 5, 2012 |
| 0092-10-08 | Investigation of Testing Methods to Determine Long Term Aggregate Durability of Various Types of Wisconsin Aggregate Sources | October 27, 2011 |
| 0092-10-10 | Cone Penetrometer Comparison Testing | May 20, 2011 |
| TPF-5(128) | Accelerated Implementation of Intelligent Compaction Technology for Embankment Subgrade Soils, Aggregate Base and Asphalt Pavement Material | September 30, 2011 |
Completed Research
| Project ID | Title | End Date |
|---|---|---|
| 0092-07-04 | Comparison
of Three Different Methods for Determining Pile Bearing Capacities |
March 2009 |
| 0092-07-05 | Development of Testing Methods to Determine Interaction of Geo-grid Reinforced Granular Material for Mechanistic Pavement Analysis | October 2008 |
| 0092-06-05 | Comparison of Basic Lab Test Results with More Sophisticated Lab and In-Situ Test Methods on Soils in Southeastern Wisconsin | September 2008 |
| 0092-00-13 | Evaluation of Bridge Approach Settlement Mitigation Methods | October 2007 |
| 0092-05-08 | Determination of Shear Strength Values for Granular Backfill Materials Used by Wisconsin DOT | August 2007 |
| 0092-05-09 | Investigation of Vertical Members to Resist Surficial Slope Instabilities | June 2007 |
| 0092-03-11 | Determination of Typical Resilient Modulus Values for Selected Soils in Wisconsin | May 2006 |
| 0092-02-03 | Investigation of Testing Methods to Determine Long-Term Durability of Wisconsin Aggregate Resources Including Natural Materials, Industrial Byproducts, and Recycled/Reclaimed Materials | November 2005 |
| 0092-04-09 | Investigation of Standard Penetration Torque Testing (SPT-T) to Predict Pile Performance | September 2005 |
| 0092-03-12 | Development of Methodology to Include Strength Contribution of Select Subgrade Materials in Pavement Structure | October 2005 |
| 0092-01-05 | Investigation of the DCP and SSG as Alternative Methods to Determine Subgrade Stability | October 2005 |
| 0092-00-12 | Equivalency of Subgrade Reinforcement Methods | October 2005 |
| 0092-45-18 | Field Performance of Subbases Constructed with Industrial Byproducts | October 2005 |
| 0092-45-15 | Effectiveness of Geosynthetics in Stabilizing Soft Subgrades | October 2005 |
| 0092-04-08 | Application of Electromagnetic Geophysics (EMG) Technology to Subsurface Investigations | June 2005 |
| 0092-02-01 | Determination of Influences on Support Strength of Crushed Aggregate Base Course Due to Gradational, Regional, and Source Variations | February 2004 |
| 0092-00-14 | Estimating Soil/Pile Set-up | September 2003 |
Research Implementation Activities
| Project ID | Title | End Date |
|---|---|---|
| 0092-06-08 | Implementation of Equivalency of Alternative Working Platforms and Their Pavement Design Strength Contribution Projects | Completed March 2009 |
| 0092-07-21 | Implementation of Determination of Shear Strength Values for Granular Backfill Material Used by the Wisconsin Department of Transportation | June 30, 2009 |
| 0092-08-37 | Implementation of Project Three Different Methods for Determining Pile Bearing Capacities | November 30, 2009 |
| 0092-08-38 | Implementation Investigation of Vertical Members to Resist Surficial Slope Instabilities | March 31, 2010 |